A tech pack is the document that turns your design idea into a garment a factory can actually make. It is a set of pages that shows the factory what the garment looks like, how it is measured, what it is made from, how it is sewn, and how it should be labelled and packed. When a tech pack is clear, the factory can quote accurately, make the pattern correctly, and produce a first sample that is close to what you imagined. When it is vague or missing, the factory has to guess — and guessing is what causes wrong samples, extra rounds of corrections, and wasted weeks.
Many first-time brands worry that a tech pack needs to be a professional document made with expensive software. It does not. A clear tech pack made in a spreadsheet and a drawing tool, or even a well-organised PDF, is enough for a small-batch factory. What matters is that every decision is written down in one place. This guide explains what goes into a tech pack, how to put one together for your first collection, and what to do if you do not have one yet.
What Is a Tech Pack, and Why Does It Matter?
A tech pack, short for technical package, is the instruction manual for your garment. It is the single document the pattern maker, the sample sewer, the merchandiser and the quality controller all work from. If two people in the factory disagree about how a garment should be made, the tech pack is what settles it.
For a small brand, a tech pack does three practical things. First, it gets you an accurate quote. A factory quotes from the tech pack: the fabric, the trims, the construction details and the quantities all affect the price. A vague brief — “a dress like this photo” — forces the factory to assume the details, and assumptions are where quotes go wrong.
Second, it reduces sampling rounds. Most first samples need some correction, but a good tech pack keeps the corrections small: a measurement tweak, a stitching change, a different button. A poor tech pack produces big surprises: the wrong fabric weight, a missing pocket, a zip in the wrong place. Each extra sampling round costs a sample fee and a week or more of time.
Third, it protects you in bulk production. The bulk order is made to the confirmed sample and the tech pack. If a bulk garment comes back wrong, the tech pack is the record of what was agreed. Without it, there is no shared reference to point to.
What Goes Into a Tech Pack
A complete tech pack usually has six parts. You do not need all six to be perfect for a first collection, but the more complete it is, the fewer questions the factory will need to ask.
1. Flat sketches. A flat sketch is a technical drawing of the garment laid flat, front and back, showing the shape, seams, pockets, closures and trims. It does not need to be a fashion illustration — a clean line drawing is better, because it shows construction clearly. Draw the front view and the back view. Add callouts — small notes with arrows — for every detail: “invisible zip at centre back”, “elastic waistband”, “patch pocket 12 cm wide”. If you cannot draw, a clear reference photo with notes written on it can work as a starting point, and the factory can help you develop it into a flat sketch.
2. Measurements and size specifications. This is a table of measurements for the garment in each size you want to produce. It should list the points of measure — the specific places the factory measures — such as chest width, waist, hip, length, sleeve length and shoulder width. Give the measurements for the base size first, then the graded measurements for the other sizes, or at least the grade rules: how much each measurement changes from one size to the next. Always state whether the measurements are for the garment laid flat or for the body, and in centimetres or inches. Mixing the two is one of the most common mistakes in first tech packs.
3. Bill of materials (BOM). The BOM lists every material in the garment: the main fabric, the lining, the thread, the buttons, the zips, the elastic, the labels and the hangtags. For each item, give the type, the colour, the supplier or source if you have one, and the quantity per garment. If you do not know the exact fabric yet, describe what you need — for example, “cotton poplin, around 120–140 gsm, soft hand feel” — and the factory can source options for you to choose from. Our fabric guide explains the most common fabric types for womenswear and what to ask for.
4. Construction details. This section explains how the garment is put together: seam types, stitch density, hemming, topstitching, and any special techniques such as gathering, pleating or smocking. You do not need to specify every stitch if you trust the factory’s standard — but you should flag anything unusual. If a seam should be French-seamed for a clean inside finish, or a hem should be a rolled hem rather than a straight hem, write it down. Photos of construction details from a reference garment are very useful here.
5. Labels and packaging. List every label: the main brand label, the size label, the care label and any hangtag. Give the label size, position, and wording or artwork. For the care label, list the wash instructions and the fibre composition once the fabric is confirmed. Also describe the packing: folded or on a hanger, one piece per bag or sets packed together, and any tissue paper or stickers. Packing affects the price, so agree on it before the quote is finalised.
6. Colourways and artwork. If the style comes in several colours, list each colourway with its fabric colour, thread colour and trim colour. If there is a print or embroidery, include the artwork file, the print size and position, and the colours in the print. For a first collection, keep the number of colourways small — each colourway is extra work in sampling and production.
How to Build a Tech Pack Step by Step
Start with one style, not the whole collection. Pick your simplest style first and build its tech pack completely. The first one takes the longest; after that, you can copy the format for the rest of the collection.
Step 1: Collect your references. Gather your sketches, reference photos, fabric swatches and any physical sample you own. Put them in one folder per style, so nothing is scattered across emails and chat messages.
Step 2: Draw the flat sketch. Front and back, with callouts for every detail. If you are working from a physical sample, lay it flat and photograph it from directly above, then trace the outline. Mark every seam, pocket and closure.
Step 3: Write the measurement table. Measure the reference garment if you have one, or write the target measurements for the base size from your size chart. List each point of measure and the value. If you are not sure about a measurement, leave it blank and mark it “to confirm with factory” rather than guessing — a wrong number is worse than a missing one.
Step 4: List the materials. Write down the fabric, lining, trims and labels. Where you do not know the exact material, describe the requirement and let the factory propose options. Note anything you already have, such as your own labels or hangtags.
Step 5: Add construction notes and colourways. Write the construction details, the colourways, and the artwork if there is any. Then read the whole document once through and ask: could someone who has never seen this garment make it from these pages alone? If the answer is no, add the missing information.
Step 6: Send it as one file. Send the tech pack as a single PDF per style, with the file named by style number. A single file is easier for the factory to file, print and share with the pattern maker than a dozen separate images in a chat thread.
Common Tech Pack Mistakes to Avoid
First-time tech packs usually fail in the same few ways. The most common is missing measurements — a sketch with no measurement table, or a table that lists only three or four measurements when the garment needs fifteen. The factory can work out some measurements from the sketch, but every guessed measurement is a fit risk.
The second is contradictory information: the sketch shows a zip at the back, the notes say a zip at the side, and the reference photo has no zip at all. When the tech pack contradicts itself, the factory has to stop and ask, which costs days. Read your tech pack once looking only for contradictions before you send it.
The third is no tolerance. Every garment has a measurement tolerance — a small allowed difference between the specification and the finished garment, usually plus or minus half a centimetre to one centimetre depending on the measurement. If you do not state the tolerance, the factory will use its own, and you may disagree about whether a sample passes. A short note — “tolerance ±0.5 cm on all measurements unless stated otherwise” — is enough.
The fourth is forgetting the inside of the garment. Customers see the outside, but the factory needs to know the inside too: is it lined, are the seams overlocked, is there a facing? A sketch that only shows the outside leaves the construction open to interpretation.
The fifth is sending a tech pack and then changing it by chat message. Every change should go into the tech pack as a new version, with the version number and date on it. If the pattern maker is working from version one and the sample sewer is working from a chat message that changed version one, the sample will be wrong.
What If You Do Not Have a Tech Pack Yet?
Many small brands start without a tech pack, and that is workable if you are honest about it. A factory that offers pattern development can work from what you do have: a design drawing, a reference image, or a physical sample. The factory will make the pattern, sew the sample, and help you record the measurements and details as the sample develops. The first sample then becomes the basis for a tech pack.
What you should not do is send only a fashion illustration or a photo from a shopping website and expect a finished garment. A photo shows the look but not the construction, the measurements or the materials. If a photo is all you have, add notes to it: what you like about it, what you want changed, what fabric you imagine, and what sizes you need. The more you write down, the fewer rounds of sampling you will need.
If you have a rough idea but no drawing at all, consider working with a designer first to develop the design and a basic tech pack. A factory’s job is to make the garment; a designer’s job is to design it. Trying to do both through the factory usually costs more time than it saves. Our guide to working from sketches explains what a factory can do with a hand sketch and what it still needs from you.
How the Factory Uses Your Tech Pack
Once your tech pack arrives, the factory follows a clear sequence. First, the merchandiser reads it and quotes: fabric and trim costs, pattern and sampling costs, and the bulk unit price. The quote depends on the details in the tech pack, which is why a complete tech pack gets a more accurate quote. If the quote is higher than you expected, the tech pack also shows you where the cost is — a lined garment, a special fabric, or a complicated construction — so you can decide what to simplify.
Next, the pattern maker makes the pattern from the flat sketch and the measurement table. Then the sample sewer makes the first sample, which is checked against the tech pack: measurements, construction, fabric and trims. Sampling usually takes 7–14 days once fabrics and trims are confirmed. Seven days is achievable only for simple styles such as T-shirts and camisoles without printing or embroidery.
When the sample is ready, you check it against your tech pack and send your comments. The factory revises the pattern and, if needed, makes a second sample. Once you confirm the sample in writing, the factory grades the pattern into the full size range and starts bulk production, which usually takes 4–5 weeks. If you want to understand the sampling timeline in more detail, our sampling time guide breaks down what happens at each stage.
The sample fee is usually USD 60–120 per piece for adults and USD 40 per piece for childrenswear, with the exact fee confirmed per style when you request a quote. The sample fee is credited or refunded when your bulk order reaches 300 pieces per style. Our usual minimum order is 80–100 pieces per style per color, with some styles available from 50 pieces. If you are planning quantities and costs, our cost guide explains what goes into a garment’s price.
Frequently Asked Questions
Do I need a tech pack for my first order?
It is strongly recommended, but not always required. If you have a design drawing, a reference image or a physical sample, a factory with pattern development can work from that and build the technical details during sampling. What you should not do is send only a photo with no notes. The more information you provide, the fewer sampling rounds you will need.
What software do I need to make a tech pack?
None in particular. Many small brands make tech packs in a spreadsheet for the measurements and BOM, plus a drawing tool or even a hand sketch for the flat sketch, combined into one PDF. What matters is clarity, not software. If you work with a designer, they may use Illustrator or a dedicated tech pack tool, but the factory can work with any clear format.
How detailed should the measurement table be?
List every point of measure that defines the garment’s fit: chest, waist, hip, length, sleeve length, shoulder, neck and any style-specific measurement such as a pocket position or a slit height. For a dress, that is usually 12–18 measurements. State whether the measurements are flat garment measurements or body measurements, and use one unit — centimetres or inches — throughout.
What is a tolerance, and why does it matter?
A tolerance is the small allowed difference between the measurement in your tech pack and the finished garment, usually ±0.5 cm to ±1 cm depending on the measurement. No two handmade garments are identical, so a tolerance tells the factory — and you — what counts as acceptable. Without one, you may reject a sample over a difference the factory considers normal.
Can the factory help me write a tech pack?
Yes, in most cases. A factory that offers pattern development can take your drawing, reference image or physical sample and develop the pattern, measurements and construction details during sampling. The first sample then becomes the reference for the bulk order. Be clear about what you have and what you need, and the factory will tell you what is missing.
How many sampling rounds should I expect?
Most styles need one or two rounds. The first sample checks the overall shape, fit and construction. The second sample, if needed, corrects the details. More than two rounds usually means the brief was unclear or the fit needs a bigger change. A complete tech pack is the best way to keep the number of rounds low.
What should I do if I want to change the design after the first sample?
Send the change as a written revision to the tech pack, with a new version number and date, and mark exactly what changed. Do not send changes only by chat message. The factory needs one current version of the tech pack to work from, or the sample and the bulk order can end up following different instructions.
Working with Laiwen Clothing
Laiwen Clothing is a small-batch OEM/ODM garment manufacturer in Humen, Dongguan, China, making womenswear, childrenswear and family wear for overseas startup brands. We work from your design drawing, reference image, physical sample or tech pack — sourcing fabric and trims, making patterns, sampling, grading, producing bulk, and handling quality control and packing. Patterns are kept in-house for production. Our usual minimum is 80–100 pieces per style per color, with some styles from 50 pieces, sampling in 7–14 days and bulk production in 4–5 weeks. If you have a tech pack ready, or only a sketch and an idea, contact us and we will tell you what we need to quote and start your first sample.

